ROLLOUT
Finish
One workspace per salon: its own database, API and agent service, stood up from the blueprint and checked before anything goes live. The files below are generated from the config, in the formats the Lollicut stack already reads.
Nothing to roll outThis salon has no config. The blueprint does not fit it, so none was proposed.
Lollicut, measured
Spec to last integration mergeabout 9 hoursdocs/submission/devpost.md, from git log (Nov 14, 3:46 am to 12:56 pm ET)
Backend tests534 passed, 27 deferred skipsbackend/README.md (HAC-75, HAC-76, HAC-64, HAC-26)
Second salon, end to endnot measuredNo second salon has been stood up yet. "Days, not weeks" is a target until one is timed.